Architectural Design
2014 - present
Role: LAM Part 2 Graduate Architect
Employer: GDP Architects
RIBA Stage 2: Concept Design
-
Correspondence with collaborating foreign architect
-
Design reviews with client involving high-level management
RIBA Stage 3: Spatial Coordination & Stage 4: Technical Design
-
Drawings preparation and submission for Planning Application
-
Drawings preparation and submission to Fire Department
-
Drawings preparation and submission for Building Regulations
-
Design coordinations with consultants and specialists (acoustic, AV, facade, lighting)
-
Tender drawings preparation and submission
-
Tender briefing and evaluation
-
Contract drawings preparation and submission
-
Value engineering report preparation
RIBA Stage 5: Construction
-
Material selections review with client (including costing exercise)
-
Responding to contractor's submittals (requests for information, material submissions, work method statements and shop drawings)
-
Preparing contractual letters to contractor (underperforming, non-compliance to contract)
-
Preparing concern letters to consultants and specialist consultants
-
Design Change Request paperwork (e.g. design variations, provisional sum items, client's request)
-
Factory Acceptance Test (lift carriage)
-
Construction quality inspections
-
Stone dry-lay inspection
-
Reviewing Operation and Maintenance Manual by contractor





